Phase 2B
Public Consultation:
Round 2 Public Consultaton
Handout – Round 2 Public Consultation
Exhibits – Round 2 Public Consultation – Introduction
Exhibits – Round 2 Public Consultation – Existing Conditions
Exhibits – Round 2 Public Consultation – Functional Design
Exhibits – Round 2 Public Consultation – Evaluation Methodology
Exhibits – Round 2 Public Consultation – Next Steps
Technically Preferred Alignment – Round 2 Public Consultation – Corridor 5 – Gatineau
Technically Preferred Alignment – Round 2 Public Consultation – Corridor 5 – Ottawa
Technically Preferred Alignment – Round 2 Public Consultation – Corridor 6 – Gatineau
Technically Preferred Alignment – Round 2 Public Consultation – Corridor 6 – Ottawa
Technically Preferred Alignment – Round 2 Public Consultation – Corridor 7 – Gatineau
Technically Preferred Alignment – Round 2 Public Consultation – Corridor 7 – Ottawa
Focused Segment Community Meetings
Round 1 Public Consultation
Round 1 Public Consultation Report
Value Planning Workshop Presentations (Corridor 5, Corridor 6, Corridor 7)
World Café Presentation (Ottawa)
Reports:
Draft Evaluation Methodology Report
Draft Natural Environment Report
Draft Transportation Report (Appendices)
*******************************
Phase 2A
Final Documentation:
- Study Design Addendum 1
- Appendices
- Phase 1 Corridors 5, 6 & 7 Maps
- Phase 2A Corridor 5 Map
- Phase 2A Corridor 6 Map
- Phase 2A Corridor 7 Map
Final Consultation Summary Report
- Appendix A – Promotions and Communications
- Appendix B – B1: Event Structure and B2: Display Boards; B3: Comment Submissions Part 1, Part 2, Part 3, Part 4, Part 5, Part 6, Part 7, Part 8, Part 9, Part 10, Part 11, Part 12, Part 13, Part 14, Part 15, Part 16, Part 17, Part 18, Part 19, Part 20, Part 21
- Appendix C – Public Consultation Group
- Appendix D – Community Consultation Groups
- Appendix E – E1: Ottawa Lowertown Meeting Minutes and E2: Notice for Presidents’ Council Event; E3: Comment Submissions Part 1, Part 2
- Appendix F – Online Consultation
- Appendix G: Mail, Fax and EMail Submissions Part 1, Part 2, Part 3, Part 4, Part 5, Part 6, Part 7, Part 8, Part 9, Part 10, Part 11
- Appendix H – First Nations Meeting Minutes
Public Session Materials:
Reports:
Project Description for the Canadian Environmental Assessment Registry
Notice of Commencement (as posted on the Registry on the Canadian Environmental Assessment Agency web site)
Summary Report of Correspondence
Summary Report of Existing Documentation
Media:
Media Advisory: Upcoming Public Consultations, March 19, 2010
News Release: Phase 2A Plans Released for Public Consultations, February 10, 2010
Backgrounder: Phase 2A Community Engagement Plan
Logos:
Partners Study Logos
Consultants Logos
Photos:
- Aerial Photo High Resolution (11.0 Mb)
- Aerial Photos
Downloadable Graphics and Maps (Phase 2A):
- Commercial Traffic Volumes
- Geographical Study Area Map
- Phase 1 Corridors
- Phase 1 Short-listed Corridors
- Phase 2 Corridors
- Phase 2A Corridor 5 Map
- Phase 2A Corridor 6 Map
- Phase 2A Corridor 7 Map
*******************************
Phase 1
Documents:
- Summary Report – Final report, January 5, 2009
- Final Phase 1 Documentation – Planning, Feasibility, Needs Assessment and Justification Report
- Future 2031 Traffic Demand Projections Memo
- October 2007 – Terms of Reference